Completed Projects
Outdoor kitchens, fireplaces and fire features we have built, with what each one cost, how long it took, and what went wrong along the way.
10 years building in Meridian
70+ outdoor kitchens completed
RCE-69511 Idaho registration
Reviewed by Janine Burrows Outdoor Kitchen Designer and Erica Jensen Office Manager, Outdoor Kitchen & Patio
Jobs we have finished, with what each one cost, how long it took, and what went wrong along the way.
Most builders show you a wall of photographs. Photographs tell you what something looks like on the day it was handed over. They tell you nothing about what the ground turned out to be, what had to change once the old finish came off, or how far past the estimate a gas line put the schedule.
The same five things, every time, including the parts that did not go to plan.
Read any one of these and you will know what working with us actually looks like, not just how it photographs.
What was actually there on the first visit, slab, utilities, access and all.
In their words, in the order they raised it, including what they had not thought of.
The reasoning behind the layout, the materials and the footings.
The change orders, the delays and the things we only found once we opened it up.
Where it landed against the estimate, and what the finished job actually does.
A real range on every job. Not a single number with nothing behind it.
The costs are ranges rather than exact figures, because the final invoice on any of these depended on choices made partway through. A range is what we can publish honestly, and it is more use to somebody trying to work out a budget than one number with no context attached.
Click any one to read how it was built.
Northwest MeridianFrom a Gas Stub to a Full Outdoor KitchenOutdoor Kitchen Remodel$22,000 to $28,0005 to 6 weeksRead the build →
Turning a Bare Concrete Slab Into a Full Outdoor KitchenOutdoor Kitchen Construction$19,000 to $25,0004 to 5 weeksRead the build →
Giving a Decade-Old Outdoor Kitchen New LifeOutdoor Kitchen Remodel$17,000 to $23,0005 to 6 weeksRead the build →
Fitting a Full Outdoor Kitchen Onto a Tight Suburban LotOutdoor Kitchen Construction$16,000 to $21,0004 to 5 weeksRead the build →
Building a Fireplace That Anchors an Established YardOutdoor Fireplace$14,000 to $19,0004 to 5 weeksRead the build →
A Pizza Oven Built to Handle Wide-Open Acreage WindBuilt-In Pizza Oven$13,000 to $18,0004 to 5 weeksRead the build →
A Family’s First Fire Pit, Done Right the First TimeFire Pit Installation$6,500 to $9,5002 to 3 weeksRead the build →
Squeezing a Full Kitchen Onto a Small Historic LotOutdoor Kitchen Remodel$18,000 to $24,0005 to 6 weeksRead the build →
Getting a Wood-Fired Oven to Draw Clean in Open CountryBuilt-In Pizza Oven$13,000 to $18,0003 to 4 weeksRead the build →
Reworking a Kitchen Around an Existing Covered PatioOutdoor Kitchen Remodel$20,000 to $26,0005 to 6 weeksRead the build →Tell us what you have in mind. We come out, look at the space, and give you a straight answer on what it takes.
Get a Free Site MeasureFour things and we can call you back with something useful. No obligation.