Outdoor Kitchen Remodel
Twelve years of freeze and thaw had cracked the tile counter and chipped the stucco. Demo showed the block underneath was mostly sound, and the mortar joints were not.
10 years building in Meridian
70+ outdoor kitchens completed
RCE-69511 Idaho registration
Reviewed by Janine Burrows Outdoor Kitchen Designer and Erica Jensen Office Manager, Outdoor Kitchen & Patio
Not a blank slate. The opposite problem: a twelve year old kitchen that had taken a decade of freezing and thawing without much maintenance in between.
The house was about twelve years old, and the outdoor kitchen had been built early on, probably by the original owner or a previous contractor doing a builder-grade add-on. It had a grill, a small stretch of tile counter, and a stucco-over-block base.
By the time the current owners called, the tile counter had visible cracking along the grout lines, the stucco finish was chipping at the base where snow had sat against it for years, and the grill was original, old enough that parts were not easy to source any more. It was not unsafe. It just looked its age next to a yard the owners had otherwise kept up well.
They were not looking to reinvent the space. The footprint and location worked, and they liked where it sat relative to the patio furniture and the shade.
Demo came first, and it told us more than the walkthrough had. Once we pulled the old stucco and tile off, the block core underneath was in decent shape structurally, but the mortar joints in a few spots had degraded further than expected from years of moisture getting in behind the finish.
We kept the parts of the block wall that tested solid and rebuilt the sections that did not, rather than tearing the whole thing back to the footing. A full teardown was not necessary once we could see what we were actually working with.
For the new finish we moved away from stucco entirely and went with a manufactured stone veneer. Stucco looks clean when it is new, but it is a maintenance commitment in a climate with real freezing and thawing, and this yard had already shown what a decade of deferred maintenance does to it. Stone veneer handles moisture and temperature swings with a lot less upkeep, which mattered more to them than matching the original look exactly.
We also moved the gas line connection point by about a foot and a half to line up with the new appliance layout, since the old grill’s fittings did not match current standard sizing anyway.
The mortar joint issue was the real complication. What looked like a straightforward re-face turned into a partial structural rebuild once we saw how much moisture had got in behind the old stucco over the years. That added most of a week to the schedule and came with a change order, since it was not something we could have fully assessed until the old finish was off.
We walked them through it as soon as we found it rather than waiting until the invoice, which is the only way that conversation goes well.
The other snag was the tile-to-stone transition at the countertop edge. The new stone veneer sat slightly proud of where the old tile line had been, which meant the new countertop template had to account for a small dimensional shift that was not obvious until the block rebuild was framed out. Minor, but it pushed the countertop measurement and order out by a few days.
Roughly six weeks after starting, including the unplanned mortar repair, they had a fully rebuilt kitchen on the same footprint, finished in stone veneer instead of stucco, with a new grill and a properly sized gas connection.
The kitchen’s location and its relationship to the patio stayed exactly the same. It just stopped being the tired-looking part of the yard.



One call, one visit, and a quote that names what it covers.
Or call (208) 856-3233Every one of these has the same five sections, including what went wrong.
Northwest MeridianFrom a Gas Stub to a Full Outdoor KitchenOutdoor Kitchen Remodel$22,000 to $28,0005 to 6 weeksRead the build →
Turning a Bare Concrete Slab Into a Full Outdoor KitchenOutdoor Kitchen Construction$19,000 to $25,0004 to 5 weeksRead the build →
Fitting a Full Outdoor Kitchen Onto a Tight Suburban LotOutdoor Kitchen Construction$16,000 to $21,0004 to 5 weeksRead the build →
Building a Fireplace That Anchors an Established YardOutdoor Fireplace$14,000 to $19,0004 to 5 weeksRead the build →
A Pizza Oven Built to Handle Wide-Open Acreage WindBuilt-In Pizza Oven$13,000 to $18,0004 to 5 weeksRead the build →
A Family’s First Fire Pit, Done Right the First TimeFire Pit Installation$6,500 to $9,5002 to 3 weeksRead the build →
Squeezing a Full Kitchen Onto a Small Historic LotOutdoor Kitchen Remodel$18,000 to $24,0005 to 6 weeksRead the build →
Getting a Wood-Fired Oven to Draw Clean in Open CountryBuilt-In Pizza Oven$13,000 to $18,0003 to 4 weeksRead the build →
Reworking a Kitchen Around an Existing Covered PatioOutdoor Kitchen Remodel$20,000 to $26,0005 to 6 weeksRead the build →We measure the space, tell you what your yard allows, and build it so nothing shifts on you in winter. One visit, and a quote that names what it covers.
Get a Free Site MeasureFour things and we can call you back with something useful. No obligation.